CDD-0216 Revised 07-13-2024 Page 1 of 4
Fees and Charges Collected on Commercial Building Permits
1. Valuation is determined by the Building Official
2. Fees are based on the calculated valuation for the structure per the ICC valuation tables and any site and grading
improvements or the contract value, whichever is higher.
Multiply $0.005553 for each dollar
over $100,000 and add $866
$99,999.01 - $2,999.999.99
Multiply $0.006787 for each dollar
over $100,000 and add $1,078
Multiply $0.0042 for each dollar over
$3 million and add $16,970
$3,000,000.00 - $9,999,999.99
Multiply $0.005133 for each dollar
over $3 million and add $20,761
Multiply $0.0042 for each dollar over
$3 million and add $16,970
$10,000,000.00 & above
Multiply $0.00462 for each dollar
over $10 million and add $56,692
ADDITIONAL PLAN REVIEW FEES
1. Plan Revision Review – $214 per hour
2. Phased Permits – Additional 20% of Plan Review and
Permit Fees (all fees on the main permit must be paid
prior to the issuance of a phased permit)
3. Fire Plan Review – $149 per hour
4. Planning Projects (Proposed New) – 15% of Building Plan
Review, but no less than $388
5. Planning Master Plan or Same Commercial
Buildings (Proposed New) – 15% of Building Plan Review
and 7.5% on subsequent buildings
ADDITIONAL CHARGES BASED ON VALUATION
1. Construction Excise Tax – Valuation of all new square footage x 0.008 (if new Sq. Ft. 2002 ICBO value table is used)
2. Strong Motion Fee – Valuation x 0.00028 (min. $0.50)
3. City Business Operations Tax – Valuation x 0.0004 ($5,000 maximum per year, per contractor)
4. Green Building Fee – $1 per $25,000 of valuation (min. $1)
5. General Plan Fee – $2.60 per $1,000 of valuation (max. $26,000)
ADDITIONAL INSPECTION FEES
1. Reinspection Fee – $214 per hour
1
5. Planning Inspection – Commercial < $100,000
2. Emergency Inspection –$642 minimum
2
Valuation (Proposed New) – $468
3. Overtime Inspection –$642 minimum
2
6. Planning Inspection – Commercial < $3M Valuation
New Buildings – $0.11 x sq. ft. (min. $169)
7. Planning Inspection – Commercial > $3M Valuation
TI’s, Remodels, Additions – $0.08 x sq. ft. (min. $169)
CERTIFICATES OF OCCUPANCY
1. Temporary Certificate of Occupancy – $633
2. Certificate of Occupancy – Gratis
1. Technology Surcharge – 8% of Permit and Plan Review Fee
2. Replacement Plans – $5.00 per sheet of copy
NOTE: ADDITIONAL IMPACT FEES MAY BE APPLIED TO SPECIFIC PROJECTS
1
Charged hourly, one hour minimum for commercial
2
Charged hourly at time and a half, two hour minimum